Pipe Replacement in Apartment — Complete Renovation with Guarantee
Old corroded galvanised pipes out, new PP-R or PEX pipes in — clean and tidy

Galvanised steel pipes and cast-iron drainage that have been working for decades eventually need replacement. The process is delicate — we are working in someone's home, so cleanliness, proper scheduling and minimal disruption are paramount for us. When is pipe replacement in an apartment needed? With corroded, scale-filled galvanised steel pipes — these pipes are on average 40–60 years old in Tallinn panel-block buildings and their diameter narrows every year. With cast-iron sewer pipes — the pipe walls are brittle and break easily during renovation work. With recurring leaks — if the same spot keeps leaking, it makes more sense to replace the whole section at once. Before renovation — combine pipe replacement with a bathroom or kitchen renovation project. We carry out complete pipe replacement in apartments in stages. First we remove the old pipes (galvanised steel, cast-iron drainage). Then we install new water supply in PP-R or PEX — both cold and hot water lines. Drainage is installed in PVC pipe with the correct gradient (minimum 1–2 cm per metre). At the end of each stage we carry out checks — shut-off tests and a pressure test for water supply, and a flow test for drainage. Most apartment replacement projects are completed in 2–4 days (depending on apartment size). We coordinate water shut-offs with the building caretaker in advance — usually 4–8 hours during daytime. Neighbouring apartments do not lose water during this time. During work we cover floors with protective sheeting, carry materials in and out while protecting stairwell walls, and carry out a thorough double clean-up after completion. You receive complete documentation including a pipe layout diagram and a 12-month guarantee.
Frequently Asked Questions
Are both water supply and drainage pipes replaced at the same time?
We recommend replacing both at the same time if the apartment is being opened up — it saves significantly on labour and demolition costs in future. We can also replace just one system if the other is in good condition.
How long does pipe replacement in an apartment take?
A complete replacement for an average 2–3 room apartment takes 2–4 working days. A smaller flat (1 room + bathroom) can be done in 1–2 days. Planning is important — we coordinate water shut-offs in advance.
Does the apartment remain habitable during the work?
Yes, generally yes. There is no water only during the shut-off period (4–8 hours per day). We cover floors with protective sheeting and keep the work zone tidy. Residents can stay in the apartment — some noise is unavoidable during this time.
Can we combine pipe replacement with bathroom renovation?
Yes and it is very sensible. Torupro handles the pipe work — water supply, drainage, mixers. For tiling and finishing work we recommend cooperating with a reliable renovation partner. We help coordinate the work.
What to expect from us
- Free initial consultation and an exact price estimate
- Modern equipment and certified materials
- Clean, tidy work with no mess left behind
- A 2-year guarantee on completed work
Our services
Need this service?
Get in touch and our specialist will give you a quick overview and a price offer.